CIWM Level 4 High Risk Operator Competence for Managing Non-Hazardous Open Landfill (HROC2a/HROC2b)
Assessor Visits - 7
Preferred Completion Timescale - 52 weeks
Credits Required - 63
For those who need to demonstrate competence in managing non-hazardous open landfill.
To achieve this qualification, candidates will need to choose one pathway to complete.
Mandatory Units
- Maintain Health and Safety in the Waste Resource Management Industry (A/508/0756)
- Manage the Environmental Impact of Work Activities (F/508/0757)
- Provide Leadership and Management in the Workplace (L/508/0759)
- Identify and Implement Improvements to Waste Management Operations (K/508/0882)
- Control Maintenance and other Engineering Operations (M/508/0883)
- Procedural Compliance (T/508/0884)
- Manage and Maintain Systems for Responding to Emergencies (A/508/0885)
- Manage an Inspection visit at your Site from Regulatory Bodies (Y/508/0974)
Mandatory Units - Non-Hazardous Landfill Pathway (HROC2a)
- Manage the Movement, Sorting and Storage of Waste (F/508/0760)
- Manage the Reception of Non-Hazardous Waste (J/508/0887)
- Manage Disposal Operations of Non-Hazardous Waste to Landfill (L/508/1006)
Optional Units - Non-Hazardous Landfill Pathway (HROC2a)
If the Non-Hazardous Landfill pathway is chosen, candidates are required to complete one of these units as outlined below.
- Restore and Prepare Landfill Sites for Aftercare (F/508/1021)
- Develop Restoration and Aftercare Schemes for Non-Hazardous Landfill Sites (A/508/1020)
- Prepare Landfill Sites for the Acceptance of Non-Hazardous Waste (K/508/1014)
Mandatory Units - Non-Hazardous Single Waste Stream Pathway (HROC2b)
- Manage the Reception of Non-Hazardous Waste on a Single Waste Stream Site (L/508/0972)
- Manage the Movement, Sorting and Storage of Waste on Single Waste Stream Sites (H/508/0976)
- Manage Disposal Operations of Non-Hazardous Waste to Land on a Single Waste Stream Site (D/508/1012)
Optional Units - Non-Hazardous Single Waste Stream Pathway (HROC2b)
If the Non-Hazardous Single Waste Stream pathway is chosen, candidates are required to complete one of these units as outlined below.
- Restore and Prepare Landfill Sites for Aftercare (F/508/1021)
- Develop Restoration and Aftercare Schemes for Non-Hazardous Landfill Sites (A/508/1020)
- Prepare Landfill Sites for the Acceptance of Non-Hazardous Waste (K/508/1014)
Need an alternative CIWM High-Risk qualification?